Modern Up Down LED Exterior Wall Light
Coastal Concrete Modern LED Wall Light
Coastal Concrete Modern Up Down Wall Light
Modern Up Down LED Exterior Wall Light

Coastal Concrete Modern Up Down Wall Light

Regular price $839.00

Standard Lead Time: 3 - 5 Weeks

On Display in the Byron Bay Showroom

A modern and simple up-and-down LED outdoor wall light is beautifully crafted from a  concrete cast . The design boasts a curved tube design and light is beamed up and downwards. With an IP65 rating, you have ensured suitability for the outdoors. 

This product's robust and authentic finish is charmed with natural imperfections from the unique casting process in the manufacturing, which combines concrete with weatherproof additives to survive all weather conditions. To clean this individual finish unique to each product we recommend lightly brushing, and rinsing with fresh clean water to remove any remaining sediment.

This product holds a ten-year warranty as part of our Coastal collection, except for lights with integral LEDs or drivers which are subject to a standard three-year warranty.

SKU: EAL200WL


 

Depth100mm
Back Plate Width70mm
Diameter80mm
Height160mm
Dimmable  No
MaterialConcrete Cast
Globe

6.1W LED

Lumens

114.68lm

Colour Temperature3000K
Driver RequiredNo
Warranty10 Years
IP RatingIP65


 

When selecting the item you would like to purchase, please take note of the ‘Lead Time’ displayed above the “Add to Bag” button.

A ‘Lead Time’ is an estimate of the accumulative timeframe it takes for the item to be prepared and/or processed and delivered. Delivery times may vary depending on your location and the courier service. Please note the lead time varies per product meaning if you have multiple items on one order you may experience varying lead times.

Standard Lead Time (Ready to Ship) - Up to 14 days
If your item displays a lead time of up to 14 days, it is a ready-to-ship item from our Australian distributor's warehouse. Once your order is placed, it will be processed and prepared for shipping.

Standard Lead Time (On Order) - Up to 8 weeks
If your item displays a lead time of up to 8 weeks, this is an on-order item. Once your order is placed, it will experience a processing and production timeframe before being prepared to be shipped from our distributor's warehouse.

Standard Lead Time (Special Item) - Up to 18 weeks
If your item displays a lead time of up to 18 weeks, it is a special item that will be carefully sourced to order from our international designers. Once your order is placed, it will be processed and prepared for shipping to our Australian distributor's warehouse. For more information on our special items please visit our FAQs.

Made-to-Order Lead Time - Up to 16 Weeks
If your item displays a made-to-order lead time, these designs are carefully handmade or hand-assembled by our Artisan designers. The lead time of a pre-order design may range between 2-16 weeks, this includes the accumulative time it takes for your order to be processed and for the item to be handmade and/or assembled by the artisan.

Pre-Order
If your item displays a pre-order lead time, it is currently out of stock. The month displayed is an approximate date of arrival to our Australian distributor. Please note this date of arrival, is in addition to the delivery time. The lead time will be updated when the item has returned to stock.

For more information on our delivery lead times please visit our Terms and Conditions or contact our customer service team for more information.

Added to Shopping Bag
Coastal Concrete Modern Up Down Wall Light
Qty
View Shopping Bag
Continue Shopping
Customers who bought this item also added