Concrete Linear Pendant Light
Concrete Linear Pendant Light
Concrete Linear Pendant Light
Concrete Linear Pendant Light
Afends Collaboration X Nirvana
Afends Collaboration X Nirvana

BENTU Yi Concrete Linear Pendant

Regular price $1,285.00

Standard Lead Time: 12 - 16 Weeks

On Display in the Byron Bay Showroom

The Yi linear pendant light is crafted from recycled concrete and constructed with black anodised aluminium fixings. Due to the inherent nature of concrete, natural variances in texture and colour are to be expected and celebrated, making each piece unique. Designed with a minimal suspension and sleek profile this concrete beam appears to float while casting light below. With its long linear form, this pendant light is the perfect task light for kitchen bench tops suitable for residential, hospitality and commercial settings.

SKU: RM002PL


 

Height80mm
Length1245mm 
Depth48mm
Drop Length2900mm
Weight5kg 
Suspension2.9m black braided cable, 2 x S/S suspension cables
Materials

Concrete, Recycled Demolition Concrete, 

Anodised Aluminium

GlobeT5 LED Included
Lumens 1420lm 3000K Warm White, Non-dimmable
Wattage16W
Temperature3000k Warm White
DimmableNon-dimmable
Voltage110-240V
IP RatingIP20
ApplicationIndoor

When selecting the item you would like to purchase, please take note of the ‘Lead Time’ displayed above the “Add to Bag” button.

A ‘Lead Time’ is an estimate of the accumulative timeframe it takes for the item to be prepared and/or processed and delivered. Delivery times may vary depending on your location and the courier service. Please note the lead time varies per product meaning if you have multiple items on one order you may experience varying lead times.

Standard Lead Time (Ready to Ship) - Up to 14 days
If your item displays a lead time of up to 14 days, it is a ready-to-ship item from our Australian distributor's warehouse. Once your order is placed, it will be processed and prepared for shipping.

Standard Lead Time (On Order) - Up to 8 weeks
If your item displays a lead time of up to 8 weeks, this is an on-order item. Once your order is placed, it will experience a processing and production timeframe before being prepared to be shipped from our distributor's warehouse.

Standard Lead Time (Special Item) - Up to 18 weeks
If your item displays a lead time of up to 18 weeks, it is a special item that will be carefully sourced to order from our international designers. Once your order is placed, it will be processed and prepared for shipping to our Australian distributor's warehouse. For more information on our special items please visit our FAQs.

Made-to-Order Lead Time - Up to 16 Weeks
If your item displays a made-to-order lead time, these designs are carefully handmade or hand-assembled by our Artisan designers. The lead time of a pre-order design may range between 2-16 weeks, this includes the accumulative time it takes for your order to be processed and for the item to be handmade and/or assembled by the artisan.

Pre-Order
If your item displays a pre-order lead time, it is currently out of stock. The month displayed is an approximate date of arrival to our Australian distributor. Please note this date of arrival, is in addition to the delivery time. The lead time will be updated when the item has returned to stock.

For more information on our delivery lead times please visit our Terms and Conditions or contact our customer service team for more information.

Added to Shopping Bag
BENTU Yi Concrete Linear Pendant
Qty
View Shopping Bag
Continue Shopping
Customers who bought this item also added